Proton-PM introduces energy innovations at new production of rocket engines

Proton-PM (enters the integrated NGO structure Energomash State Corporation “Roskosmos”) completed the commissioning works of the block-modular boiler room of the new production building on the country site (new louds). The object was created within the framework of the investment project “Reconstruction and technical re-equipment of mechanical collecting and electroplating engine manufacturing RD-191”.

It is possible to work the new boiler in automatic mode – without the constant presence of the service personnel. The parameters are coming simultaneously to the operator of the rustic area and the head of the head of the boiler room responsible for the safe operation of the object. All information employees are obtained in real time. The energy object is made on a block and modular principle. Two boilers ensure the operation of the supply ventilation systems, which helps to exclude the imbalance of the influx and exhaust. A separate boiler is installed on lateral heating, one more – on hot water.

The use of supply-exhaust installations allows the use of emissions to heating the air of the incoming air. Part of them will work as climatic centers – maintain the necessary temperature at the final assembly and partially under the mehopling. For premises where there are no hard requirements for temperature, installations with controllers are intended. Managed sensors, they help automatically adjust the temperature in the range of plus values.

Nikolai Topilsky, the main energy engineer Proton-PM: “Thanks to innovative technical solutions, developed even at the design stage of the object, the power of the new boiler room was reduced by one and a half times: from 30 to 20 MW. This will significantly reduce the consumption of energy resources. At the same time will be provided Climatic conditions for the comfort work of the staff and the uninterrupted functioning of the equipment at the new production. “
/Media reports.